检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北省电力勘测设计研究院,河北石家庄050031
出 处:《河北工业科技》2014年第6期512-518,共7页Hebei Journal of Industrial Science and Technology
摘 要:为了降低联合循环机组主厂房投资,研究实施了一种新的M701F4单轴联合循环机组的布置方案。通过分析常规布置方案所存在的问题,以某联合循环机组工程为依托,讨论了将联合循环机组的发电机露天布置,并为发电机增加防雨罩,发电机的日常检修维护采用半门式行车。同时,在保证发电机转子和凝汽器抽管检修的基础上,对主厂房的跨度和运转层标高均进行了合理优化。新布置方案在不影响机组性能和主厂房美观性的前提下,有效减少了主厂房体积,节约了投资。A new approach of main building layout of single-shaft M701F4 combined cycle power plant is proposed to reduce the investment of main building construction.By analyzing problems existing in conventional layout plan,and taking a combined cycle unit works as the basis,this article discusses outdoor arrangement of generator section.Besides,a rain cover and a semi-portal crane are added for the generator.Meanwhile,the size and operation floor elevation are optimized rationally,based on the maintenance of generator rotor and condenser,which effectively reduces the main building volume and construction investment without changing the unit performance and the pleasant appearance.
分 类 号:TM611.31[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145