检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中南电力设计院,湖北武汉430071 [2]河南省众慧电力工程咨询有限责任公司,河南郑州450007
出 处:《电力勘测设计》2014年第5期29-34,共6页Electric Power Survey & Design
摘 要:特高压线路建设经常需要跨越游荡型河流,往往出现河中立塔情形。此时,主槽范围的合理确定至关重要,因其直接影响跨河塔位的冲刷深度,进而影响线路安全和工程造价。本文以哈密~郑州±800kv特高压直流输电线路黄河大跨越工程为例,对游荡型河流主槽范围的确定方法进行了相关分析总结,供同类工程参考。The UHV transmission lines usually need to cross the wandering reaches, which frequently lead to some line towers been placed in the riverbed. Then, reasonably ascertaining the span of the main channel becomes of great important, for which directly influences the scouring depth and then the security and price of the project. Taking the Hami-Zhengzhou ± 800kV UHV transmission line large crossing project as a example, some methods of determination the main channel span in wandering reaches have been analyzed and included, which can be referenced for some similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143