检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力设计院,上海200063 [2]浙江省火电建设公司,浙江杭州310016
出 处:《电力勘测设计》2014年第5期75-80,共6页Electric Power Survey & Design
摘 要:AP1000核电是目前世界上最先进的核电堆型,CI主厂房基本采用半地下结构,布置在CI主厂房内的主要设备有:凝汽器、发电机定子、汽水分离再热器、除氧器及除氧器水箱等设备,这些设备的重量和外形尺寸均比常规火电的设备重和大,在CI主厂房设计时,将这些设备的吊装方案融入到设计中,才能使工程的安装顺利进行,使工程的建设质量得到保证。在此根据某工程对AP1000核电厂基于设备安装的CI主厂房设计关键技术做介绍,以期为参与相关工程建设者提供参考。AP1000 nuclear is the most advanced nuclear reactor at present. CI main building is the semi-underground structure. The weight and dimension of AP1000 nuclear CI major equipment inside CI main building, such as condenser, generator stator, MSR and deaerator etc. are bigger than the fossil power plant. In order to ensuring the construction quantity and schedule, the equipment installation plan should be considered sufficiently. This document is based on one AP1000 nuclear power plant for further reference to other designers
关 键 词:AP1000核电 CI主厂房 凝汽器 发电机定子 汽水分离再热器 除氧器 除氧器水箱
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.172.7