检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都610072
出 处:《东北水利水电》2014年第11期49-50,52,共3页Water Resources & Hydropower of Northeast China
摘 要:文章分析和研究了土石坝的施工理论和实际经验,运用动态顺序随机循环网络模型,采用最小时钟值法推进仿真计算,分阶段实时控制土石坝施工过程的仿真模拟方法。根据土石坝的施工特性,建立了土石坝施工仿真模拟系统,编制了相应的仿真系统软件,并采用本系统对双江口土石坝的施工进度进行了分析研究。The paper analyzes and researches the construction theory and practical experience of earth and rock dam, promotes simulation calculation by using the minimum time cell method and the dynamic stochastic cycle network model and determines the simulation method with real-time control the construction of earth and rock dam by stages. Based on the construction characteristics of earth and rock dam, the simulation system of dam construction is established and the corresponding simulation system software is compiled. Then the construction progress of the Shuangjiangkou earth and rock dam is analysed and researched by using this system.
分 类 号:TV641[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15