检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒙世仟[1]
机构地区:[1]广西水利电力勘测设计研究院,广西南宁530023
出 处:《广西水利水电》2014年第5期81-85,共5页Guangxi Water Resources & Hydropower Engineering
摘 要:结合瓦村水电站工程地形、地质条件,对上、下坝址及坝型进行综合比选后,推荐下坝址混凝土重力坝方案,枢纽主要建筑物由拦河坝、发电厂房、左岸两级垂直升船机及交通道路等组成。根据工程实际情况,对工程总布置进行设计介绍。For Wacun Hydropower Project, the construction scheme of concrete gravity main dam at lower dam site was recommended after upper and lower dam sites as well as dam type alternatives were compared combined with topographical and geological conditions. Key structures of this project include water retaining dam, powerhouse, two-level vertical ship lift by left bank and access roads. An introduction was made on the general layout of Project.
分 类 号:TV22[水利工程—水工结构工程] TV72
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28