检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]云南省水利水电勘测设计研究院,云南昆明650021
出 处:《水力发电》2014年第12期51-54,共4页Water Power
摘 要:对庙林水电站引水发电系统的阻抗式调压井进行数值法和数学模型水力学计算,并通过模型试验验证数值计算结果的可靠性,论证阻抗式调压井型式可行性。结果表明:调压井数值法和数学模型水力学计算结果与模型试验结果基本吻合;调压井丢弃负荷后的最高涌浪水位低于调压井设计顶高程,最低涌浪水位高于调压井底板高程2.0m以上;调压井直径、阻抗孔口以及调压井顶高程是合适的,运行过程中不会发生调压井漫顶和漏空的现象。The surge shaft in the diversion system of Miaolin Hydropower Station is calculated by hydraulic numerical method and mathematical model method respectively and the calculation results are verified by model test to demonstrate the feasibility of throttled surge shaft. The results show that: (a) the calculation results of hydraulic numerical method and mathematical model method are consistent with the results of model test; (b) the maximum surge water level after load rejection is below designed top elevation of surge shaft, and the lowest surge water level is 2 meters higher than the bottom elevation of surge shaft;and (c) the diameter and size of throttled orifice and the top elevation of surge shaft are appropriate and no overtopping and hollow will occur in the operation of surge shaft.
关 键 词:阻抗式调压井 水力学计算 模型试验 涌浪水位 庙林水电站
分 类 号:TV732.51[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222