检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川电力职业技术学院,四川成都610072 [2]四川省龚嘴水力发电总厂,四川乐山614900
出 处:《水力发电》2014年第12期63-67,共5页Water Power
摘 要:针对龚嘴水电站水轮发电机组改造后出现的振动问题,通过对真机试验结果的分析,并与机组的实际运行记录进行比较,提出了调整、处理励磁轴线摆度或测量调整励磁滑环的圆度与同轴度,排查定转子空气间隙和转子绕组匝间短路以消除电磁不平衡,做调相运行工况试验进一步确认振动原因是水力不平衡还是电气不平衡,建立水轮机转轮模型仿真优化水力设计等措施,以改善水轮机稳定性和调节性。For eliminating the vibration of turbine-generator sets after transformation in Gongzui Hydropower Station, the results of prototype tests are analyzed and compared with actual operation records. Some suggestions are presented based on analysis results, including adjusting the swing of excitation axis or measuring the roundness and concentricity of excitation slide ring, checking the air gap between rotor and stator and the short circuits of rotor winding to eliminate electromagnetic imbalance, conducting phase modulation operating test to further confirm the causes of vibration being hydraulic or electrical imbalance, and establishing simulation model of runner to optimize the hydraulic design of turbine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229