检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051 [2]云南省移民开发技术服务中心,云南昆明650051 [3]河海大学,江苏南京210098
出 处:《水力发电》2014年第12期90-93,共4页Water Power
摘 要:利用小湾水电站高拱坝库盘变形实测资料,结合数值模拟技术,对小湾高拱坝库盘变形的规律、量级以及对拱坝的作用效应等进行了深入的研究,监测成果显示高拱坝库盘变形及对大坝变形性态具有影响,巨大的水荷载作用致使库盘产生坝前沉降大于坝后沉降的"翘曲"变形,使得拱坝产生向上游倾斜变形现象。Based on the measured reservoir basin deformation data of Xiaowan Hydropower Station, the deformation law and magnitude of reservoir basin deformation and the action effects on Xiaowan high arch dam are analyzed by using numerical simulation method. The results show the reservoir basin deformation has an impact on dam deformation behavior, the huge water load leads to the warping deformation of reservoir basin with the settlement before the dam greater than the settlement behind the dam and leads to the arch dam being tilted towards the upstream direction.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.40.177