检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南瑞集团公司,江苏南京211106 [2]陕西电力科学研究院,陕西西安710054 [3]安康水力发电厂,陕西安康725000
出 处:《水力发电》2014年第12期97-100,共4页Water Power
摘 要:在分析了大坝变形多种影响因素及其影响特征的基础上,利用结合多层递阶方法与多元回归分析方法建立了多因素时变监控模型,根据安康大坝表孔、中孔坝段的变形观测数据,建立了安康大坝变形预测模型。分析表明:多因素时变监控模型较多元回归分析方法具有更高的准确性,可以显著提高大坝变形预报精度。Based on the analyses of the influencing factors and influencing characteristics of dam deformation, a multiple factor time-varying model is set up by combining the multilayer hierarchical analysis method and regression analysis method. The deformation monitoring data of surface spillway and middle orifices of Ankang Dam are used to set up the prediction model of deformation. The analysis results show that the multiple factors time-varying method is more accurate than regression analysis method, and can significantly improve prediction accuracy of dam deformation.
关 键 词:大坝变形 预测模型 时变模型 多因素 安康水电站
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3