检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:边艳红[1,2] 赵亚军[2,3] 苗继军[4] 刘波[4]
机构地区:[1]神华乌海能源有限责任公司骆驼山煤矿,内蒙古乌海016000 [2]内蒙古科技大学,内蒙古包头014010 [3]内蒙古煤炭安全开采与利用工程技术研究中心,内蒙古包头014010 [4]神华乌海能源有限责任公司机电动力部,内蒙古乌海016000
出 处:《煤矿机械》2014年第11期212-214,共3页Coal Mine Machinery
摘 要:机械化快速回撤工艺在综采工作面的应用可以加快工作面的回撤速度,提高回撤质量。机械化快速回撤工艺主要解决综采工作面倾角大、顶板破碎、底板软、淋水大等各种情况,保证液压支架平稳运输,调向容易。机械化快速回撤工艺优化工序,减少人员作业量,降低劳动强度,提升安全系数,提高工作效率。Mechanized rapid installation technology the installation speed, and improve the quality of applied on fully mechanized coal face can speed up installation, and alleviate the tension of mining- excavation relay. Mechanized rapid installation technology primarily solves the problems of large dip angle ,roof broken, soft floor, and large spraying water on fully mechanized coal face, and ensures smooth transport of hydraulic support. Hydraulic support is adjusted direction easily by using muhifunctional manipulator. Mechanized rapid installation technology can optimize process, reduce the operating amounts, bring down labor intensity, rise safety coefficient and improve labor efficiency.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3