检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《施工技术》2014年第22期81-83,共3页Construction Technology
摘 要:大荷载煤仓因为地基土承载力不够而产生不均匀沉降和倾斜,需要进行加固和纠偏处理。复合注浆法综合利用注浆的加固和抬升效应,进行地基加固和构筑物沉降控制。以大荷载煤仓地基加固为例,对注浆设计与施工进行了介绍,实现了提高地基承载力和降低沉降差的目的。A coal bunker with large loads is easy to appear uneven settlement and tilt because of lack of ground bearing capacity. The foundation needs to be reinforced and the coal bunker needs to be rectified for use. The composite grouting method can reinforce the foundation and control the sedimentation of structures by utilizing the compaction and jacking effects of grouting. Taking a large load bunker foundation’ s reinforcement for example, the paper introduced the design and construction of the composite grouting method to improve the bearing capacity and reduce differential settlement.
分 类 号:TU753.8[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49