检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周志云[1] 詹亚伟 杨珏 杨飞[1] 韩明珍[1]
机构地区:[1]上海理工大学土木工程系,上海200093 [2]中冶建筑研究总院华东分院,上海200940
出 处:《工业建筑》2014年第9期166-171,共6页Industrial Construction
摘 要:某优秀历史建筑,因已使用80余年,存在明显结构老化、损伤,需要进行加固并重新装修。对原有建筑进行现场检测和抗震鉴定,基本符合我国现行各项规范要求。基于结构原有钢构件锈蚀、保护层剥落和抗侧力不足等实际情况,制定加固改造设计方案,提出增加剪力墙并对其下基础进行加固、外粘钢法和粘贴碳纤维布补强原有型钢梁、柱的加固措施,对加固改造后的结构进行了抗震验算分析,施工时采取沉降观测,改造效果良好。An excellent historic building has been used for 80 years, there are damages and obvious structural aging , which need to be reinforced and renovated .The field testing and seismic qualification were done for the original building, whose results could basically meet the requirements of the current norms in China .Based on the actual situation that the original structural steel members were corroded , protection layer falled off and resistance to lateral force was insufficient , it was developed a reinforcement design scheme , and proposed the measures of adding shear-wall and reinforcing its base , sticking steel plate outside and affixing carbon fabric to reinforce the original steel beams and columns .Then checking was carried out for seismic analysis of the reinforced structure the settlement observation was done during construction , the reform effect was excellent .
分 类 号:TU-87[艺术—艺术设计] TU746.3[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28