页岩气水平井桥塞分段压裂超压砂堵处理技术  

Technology of Handling Overpressure Sand Plug in Bridge-Plug Staged Fracturing of Shale Gas Horizontal Wells

在线阅读下载全文

作  者:李奎东[1] 

机构地区:[1]中国石化江汉油田分公司采油工艺研究院,湖北武汉430035

出  处:《江汉石油职工大学学报》2014年第6期14-16,共3页Journal of Jianghan Petroleum University of Staff and Workers

摘  要:桥塞分段压裂是页岩气水平井开发的主导技术之一,但受储层特性以及施工决策等因素的影响,超压砂堵很难避免。分析解堵机理,依据井筒中有无高粘度液体以及顶替是否完成将砂堵分为8种类型;结合页岩气储层地质、工艺特点,提出了采用疏通老缝和压开新缝的解堵方法。Controlled by formation properties and operation decision, it is difficult to avoid overpressure sand plug in the process of bridge--plug staged fracturing, one of leading technologies used in the development of shale gas horizontal wells. Sand plug is divided into eight forms according to plug removal mechanism, high viscosity liquid in the borehole and displacement completion. Combined with the characteristics of shale gas reservoir geology and process, this paper introduces a method for plug removal through tmchoking old fractures and opening new fractures by pressure.

关 键 词:桥塞分段压裂 砂堵 页岩气 水平井 

分 类 号:TE357.1[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象