检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴月龙[1] 周治刚 龚丽飞[1] 张红[1] 朱方方[1]
机构地区:[1]南京水利科学研究院南京瑞迪建设科技有限公司,南京210029 [2]江苏省水利工程科技咨询有限公司,南京210029
出 处:《南水北调与水利科技》2015年第1期140-144,共5页South-to-North Water Transfers and Water Science & Technology
摘 要:堤身变形监测及变形规律的研究,对于充淤模袋筑堤来说极其重要。现场试验设计了自然排水、真空预压排水、掺固化剂三种工法进行施工,通过监测堤身高度及宽度变化,对三种施工方法的优缺点进行了总结。结果显示,袋体高度的变化规律与袋体中淤泥固结排水的规律相一致,并且与所充填的淤泥的性质、掺入固化剂的种类和掺量以及排水的方式密切相关。研究发现,体积减少固结法可用于预测竣工后堤身高度。Monitoring the embankment deformation and its variation law is very important for the building embankment with the slurry filled geotextile tubes.Three types of construction methods were designed for the building embankment,including natural drainage,vacuum preloading drainage,and adding curing agent.The advantages and disadvantages of the three methods were summarized through the monitoring the variations of tube height and width.Results showed that the variation of tube height is consistent with the consolidation law of the slurry in the tube,and it is also related to the properties of filling slurry,the type and dosage of curing agent,and drainage way.Moreover,the volume reduction consolidation method can be used to predict the height of embankment after its completion.
关 键 词:充淤模袋 袋体高度监测 袋体宽度监测 体积减少固结法
分 类 号:TV41[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.94.208