吉图珲客运专线供电SCADA系统设计关键技术研究  被引量:3

Research on Fundamentals in Power Supply SCADA System Design of Jituhun Dedicated Passenger Line Project

在线阅读下载全文

作  者:张涛 

机构地区:[1]中铁工程设计咨询集团有限公司电气化工程设计研究院,北京100055

出  处:《铁道标准设计》2015年第1期111-114,共4页Railway Standard Design

摘  要:结合吉图珲铁路客运专线建设项目,从计算机技术、远程监视与控制技术、供电系统技术等方面进行研究,结合供电SCADA系统高实时、大容量、高可靠的建设需求,对系统中的分布式计算模式、实时数据处理技术以及存储技术进行分析与研究,并在此基础上对项目中的供电SCADA系统的建设方案进行初步设计,为后期进一步的设计方案奠定基础。With reference to Jituhun passenger dedicated line project, this paper focuses on the study of computer technology, remote monitoring, control technology and power system technology in combination with construction requirements for real-time, high capacity, high reliable power supply SCADA system to analyze calculation model, the real-time data processing and storage technology in distributed system. And based on these investigations and researches, the paper addresses the preliminarily design of the construction of the power supply SCADA system, which paves the way for future design scheme.

关 键 词:客运专线 SCADA 铁路供电 设计 

分 类 号:U238[交通运输工程—道路与铁道工程] U223

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象