检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《探矿工程(岩土钻掘工程)》2014年第10期61-63,共3页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:乌江索风营水电站Dr2危岩体加固施工作业面高差大、场地小、施工干扰大;危岩体岩层复杂,多条破碎带分布在山体中,必须穿越L1和L2裂隙。对索风营水电站Dr2危岩体距最低平台高差达110~134.5 m的上部锚索的特殊施工技术进行了介绍。Difficulties of large height difference of construction surface, small working site and complicated formations of dangerous rock exist in Suofengying hydropower station of Wujiang project with several fracture zones distributing in the mountain, the borehole must be drilled through fractures.The paper introduces the special construction technology used in upper anchor cable construction for Dr2 dangerous rocks in Suofengying hydropower station, where it has 110 ~134.5m height difference to the lowest platform.
关 键 词:无粘结预应力锚索 栈桥 危岩体加固 索风营水电站
分 类 号:TV698.2[水利工程—水利水电工程] P642.22[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170