无粘结预应力锚索在乌江索风营水电站Dr2危岩体加固中的应用  被引量:5

Application of Unboned Pre-stressed Anchor Cable in Reinforcement for Dr2 Dangerous Rocks in Suofengying Hydropower Station of Wujiang

在线阅读下载全文

作  者:周国锋[1] 陈红刚[1] 刘才高[1] 

机构地区:[1]中国水电基础局有限公司,天津301700

出  处:《探矿工程(岩土钻掘工程)》2014年第10期61-63,共3页Exploration Engineering:Rock & Soil Drilling and Tunneling

摘  要:乌江索风营水电站Dr2危岩体加固施工作业面高差大、场地小、施工干扰大;危岩体岩层复杂,多条破碎带分布在山体中,必须穿越L1和L2裂隙。对索风营水电站Dr2危岩体距最低平台高差达110~134.5 m的上部锚索的特殊施工技术进行了介绍。Difficulties of large height difference of construction surface, small working site and complicated formations of dangerous rock exist in Suofengying hydropower station of Wujiang project with several fracture zones distributing in the mountain, the borehole must be drilled through fractures.The paper introduces the special construction technology used in upper anchor cable construction for Dr2 dangerous rocks in Suofengying hydropower station, where it has 110 ~134.5m height difference to the lowest platform.

关 键 词:无粘结预应力锚索 栈桥 危岩体加固 索风营水电站 

分 类 号:TV698.2[水利工程—水利水电工程] P642.22[天文地球—工程地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象