锦屏一级水电站高陡边坡施工脚手架稳定性分析  被引量:1

Stability Analysis of Scaffolds in High and Steep Slope Construction for Jinping First Stage Hydroelectric Power Station

在线阅读下载全文

作  者:陈旭东[1] 李正兵[1] 钟声[2] 徐富刚[3] 

机构地区:[1]中国水利水电第七工程局有限公司,四川成都610081 [2]四川大学建筑与环境学院,四川成都610065 [3]四川大学水利水电学院,四川成都610065

出  处:《施工技术》2014年第23期40-43,95,共5页Construction Technology

摘  要:基于结构力学、材料力学,对高边坡脚手架的横向水平杆、纵向水平杆、立杆和连墙件等部位分别进行了内力计算,选取最不利的内力组合情况进行构件承载力分析,分析了对其安全性影响最大的应力和挠度,并应用于锦屏一级水电站高位危岩体高陡边坡双排支护排架。结果表明,脚手架应力变形的各项指标控制在规范允许范围内,说明双排钢脚手架结构安全。Based on structural mechanics,mechanics of materials,this paper calculates the internal force for these parts of scaffold,such as lateral horizontal pole,longitudinal horizontal pole,upright tube,connecting tube and so on,and selects the most unfavorable component of internal force to check the bearing capacity of the structure,analyzes the deflection and stress which has the biggest influence on the safety of the structure,which are used in the scaffold analysis in high slope for Jinping first stage hydroelectric power station. The result shows that the each index of the deformation and stress of scaffold is controlled within the specification allowing ranges,which explains that the double row scaffold structure is safe.

关 键 词:水电站 脚手架 边坡稳定性 结构设计 

分 类 号:TU731.2[建筑科学—建筑技术科学] TV513[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象