机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京100083 [2]郑州煤电股份有限公司芦沟煤矿,河南新密452370
出 处:《煤炭工程》2014年第12期10-12,共3页Coal Engineering
摘 要:为改进芦沟煤矿运输系统,需对-15m水平运输大巷进行扩修改造,对比分析两种改造方案后决定采用沿老巷道右帮重新开挖新巷并充填部分老巷的方案,通过FLAC3D数值模拟分析了施工期间及施工后巷道围岩应力分布及位移演化规律,经现场改造施工后,巷道围岩变形不大,验证了改造方案设计及施工工艺的合理性,为同类地质条件下巷道不停产扩修提供了参考经验。In order to improve a transportation system of Lugou Mine,an expansion and repair reconstruction should be conducted on the-15 m level transportation roadway. After a comparison analysis on two reconstruction plans,a plan to build a new roadway along a left sidewall of the previous roadway and to backfill partial previous roadway was determined.A FLAC3 Dnumerical simulation was applied to analyze the stress distribution in the surrounding rock of the roadway and the displacement evolution law during the construction period and after the construction. With the site reconstruction completed,the surrounding rock deformation of the roadway was not high and the rationality of the reconstruction plan design and construction technique was approved and could provide reference experiences to the reconstruction with no production stop under a similar geological condition.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91