检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹斌[1] 吴志敏[1] 张鹏[1] 俞乾[2,3] 梁高源[1]
机构地区:[1]内蒙古电力科学研究院,呼和浩特010020 [2]华北电力大学高电压与电磁兼容北京市重点实验室,北京102206 [3]湖南省电力公司永州电业局,湖南永州425000
出 处:《高压电器》2014年第12期71-78,共8页High Voltage Apparatus
摘 要:利用PSCAD电磁暂态仿真软件,对典型500 k V变电站和输电线路建模,计算出了潜供电流和恢复电压。该模型对500 k V系统有效熄弧提供了重要参数,为重合闸设备的重合时间设置和相关的继电保护定值整定,提供了切实可行的依据。对500 k V输变电工程的调试、启动和运行具有一定的指导意义。The electromagnetic transient simulation software PSCAD is used;the models of typical 500 kV substations and transmission lines are built up and the secondary arc current and the recovery voltage are calculated.This model provides an important parameter to effectively extinguishing arc in 500 k V system and also provides a practical basis to set the reclosing time of switching equipment and to set the relative relay protection fixed values.The results of this paper has a certain reference to the debugging and commissioning of500 k V power transmission and transformation project.
关 键 词:潜供电流 恢复电压 重合闸 PSCAD仿真 熄弧
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249