1000MW机组凝结水泵配置方案优化探讨  被引量:5

The Problems and Countermeasures of Condensate Pump Configuration Scheme in 1 000 MW Unit

在线阅读下载全文

作  者:李艳超 吴润华[2] 高静 狄万丰 高继录[4] 

机构地区:[1]北方能源发展有限公司,辽宁沈阳110179 [2]中电投吉林电力股份有限公司,吉林长春130022 [3]华润电力(盘锦)有限公司,辽宁盘锦124000 [4]国网辽宁省电力有限公司电力科学研究院,辽宁沈阳110006

出  处:《东北电力技术》2014年第10期44-46,共3页Northeast Electric Power Technology

摘  要:对国内1 000 MW火电机组所采用的凝结水泵配置方案进行介绍,着重分析了富川项目初步设计阶段凝结水泵配置方案可能出现的问题,并提出了优化对策。阐述了影响凝结水泵配置选型的几个重要因素,以及在选择配置方案过程中应该注意的问题,为同类机组提供参考。The paper introduces the present condensate pump configuration schemes in 1 000 MW coal fired unit, focusing on conden- sate pump configuration problems that may arise at the preliminary design stage in Fuchuan project, and optimization strategies are pro- posed. The paper explains the important factors that may influence the selection of condensate pump configuration scheme, and the problems we should pay attention to in the process of configuration scheme selectio, providing references for the the same units.

关 键 词:凝结水泵 配置方案 选型 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象