作 者:陈义军[1]
机构地区:[1]中国水电顾问集团华东勘测设计研究院有限公司,杭州310014
出 处:《工程建设与设计》2015年第1期92-95,99,共5页Construction & Design for Engineering
摘 要:根据巴山水电站坝址处地形及地质条件、水文条件、枢纽建筑布置特点,大坝采用隧洞导流、枯水期围堰断流、汛期坝体临时断面挡水度汛的导流方式。施工图阶段,由于导流隧洞前期施工进度拖后,根据导流隧洞实际揭露的地质条件较好,及时对导流隧洞的衬砌设计进行了优化,并适当加高了上游围堰,保证工程顺利实施。Based on the topographic and geologic condition, hydrological condition, and complex structure features of Bashan hydropower' station, tunnelreleasing water, dry-season-cofferdam cutting offwater, dam retaining water were used. Due to the schedule was delayed, and the geological condition was good, the lining design of diversion tunnel has been optimized during the technical construction design period. And the upper cofferdam has been properly heightened.
分 类 号:TV551.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.225