低渗岩性气藏压降法计算库容量改进  被引量:1

Low permeability lithologic gas reservoir pressure drop calculation capacity improvement

在线阅读下载全文

作  者:赵桂超 丁道权 苟启明 

机构地区:[1]中国石油大学(北京)石油工程学院,北京102249

出  处:《石油化工应用》2014年第12期25-27,36,共4页Petrochemical Industry Application

基  金:国家科技重大专项"复杂油气田地质与提高采收率技术";项目编号:2008ZX05009-004-03

摘  要:储气库库容量与工作气量是储气库建设的核心问题。对于低渗岩性气藏储气库建设,储气库库容量评价是研究的重点和难点。由于低渗气藏的关井压力恢复速度慢,在动态监测测压时,压力没有恢复到地层压力,造成计算的储量偏小,笔者将压力进行修正,使得压降法计算储量更加精准,由于频繁关井测压对产能建设有很大影响,针对测压数据少的问题,本文也进行了说明。The gas storage working gas storage capacity and gas storage are the core issue construction. For low permeability lithologic gas reservoir gas storage construction, gas storage capacity evaluation is key and difficult research. Since the shut-in pressure and low permeability gas reservoir recovery is slow, while dynamic monitoring manometry, pressure is not restored to the formation pressure, resulting in the calculation of reserves too small, I will correct reservoirpressure, making storage more accurate method to calculate the pressure drop due to frequently shut manometry has a great impact on capacity building for less manometry data, this paper also described.

关 键 词:低渗岩性气藏 储气库 库容量 压降法 

分 类 号:TE37[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象