检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]铁道第三勘察设计院集团有限公司,天津300251
出 处:《路基工程》2014年第6期131-134,共4页Subgrade Engineering
基 金:中国铁路总公司科研项目:高寒地区高速铁路路基冻胀综合防治技术试验(Z2013-038)
摘 要:通过对哈齐客运专线路基冻胀变形监测,获得(2012~2013年)路基的冻胀变形发展情况,分析了冻胀变形发生和发展规律。研究结果表明:各监测点冻胀变形随时间发展变化规律基本一致,路基冻胀变形经历了包括冻胀快速发展期、冻胀维持期、冻融循环期和融化回落期4个阶段;路基冻胀变形的发生具有普遍性,但冻胀量较大的监测点所占比例较小,说明其冻胀变形还是可控的。Through the frost heaving deformation monitoring of subgrade for Harbin-Qiqihar PDL, the data about the deformation development from 2012 to 2013 was obtained, based on which the occurrence and the development rules thereof were analyzed. The study results show that the frost heaving deformation of subgrade has substantially the same development vs. time rules at each monitoring point, which experiences the four stages, including fast growing, maintenance, freeze-thaw cycles and fallout after thawing; the occurrence of subgrade frost heaving deformation is of universality, however, the monitoring points subject to large frost heaving volume take up small proportion, which proves that the frost heaving deformation may be under control.
分 类 号:U213.14[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200