检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河水利水电开发总公司,河南济源454681 [2]黄河小浪底水资源投资有限公司,河南郑州450001
出 处:《水电能源科学》2014年第12期148-150,126,共4页Water Resources and Power
摘 要:为提高水电机组自动化水平,向无人值班,少人值守的管理模式发展,将电制动技术应用于西霞院反调节水电站。依据电制动原理对制动相关参数进行选取,并通过设计计算确定出满足西霞院反调节水电站实际工作需要的制动变压器容量;同时从生产角度出发,解决了电制动技术在自动化流程、机组保护和变压器保护配置等方面的应用问题。In order to improve the level of hydropower generator automation and promote management mode of "Noone on duty, few people on duty", the electric braking technology is applied to Xixiayuan reverse regulation hydropowerstation. Based on the electric braking principle, the related parameters are selected. It also determines the braking transformer capacity through the calculation design, which meets the actual work need of Xixiayuan reverse regulation hydro-power station. Finally, it solves the production problem of electric braking technology in application to automaticprocess, generator and transformer protective configuration.
关 键 词:西霞院水电站 自动化 电制动技术 设计计算 应用
分 类 号:TV736[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222