杭州东站10 MWp并网BIPV项目计算及校验  

Calculation and Verification of 10 MWp Grid-connected BIPV Project in Hangzhou East Railway Station

在线阅读下载全文

作  者:熊江[1] 李树庭[1] 陈勇[1] 

机构地区:[1]中南建筑设计院股份有限公司,武汉市430071

出  处:《建筑电气》2014年第11期17-22,共6页Building Electricity

摘  要:杭州东站10 MWp光伏发电示范项目采用并网BIPV系统,实现光伏并网发电和轨道交通建筑房屋一体化。对其设计中若干计算校验及重点问题进行讨论,包括光伏发电系统发电量估算、直流线路压降计算及电缆截面选择、系统短路电流计算及继电保护整定等。The grid-connected BIPV system is adopted for 10 MWp PV power generation demonstration project in Hangzhou East Railway Station to integrate the grid-connected PV power generation and the rail transportation buildings. In the paper, the calculation& verification and key issues in the design are discussed, including the estimate of generating capacity of PV power generation system, calculation of DC line voltage drop and system short circuit current, selection of cable cross-section and relay protection setting.

关 键 词:杭州东站 光伏建筑一体化 光伏并 网发电 发电量估算 压降计算 电缆截面选择 短路计算 继电保护 

分 类 号:TM615[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象