铁岗水库汛限水位分析及分期控制方案设计  被引量:1

An Analysis of the Flood Control Level and the Design of the Staging Control Proposal of Tiegang Reservoir

在线阅读下载全文

作  者:成洁 玄英姬[2] 甘晓静 

机构地区:[1]深圳市水务规划设计院,广东深圳518000 [2]三峡大学农水与水资源工程系,湖北宜昌443000

出  处:《中国农村水利水电》2014年第11期47-49,共3页China Rural Water and Hydropower

摘  要:为了挖掘水库调蓄能力,探讨水库提高汛限水位的可能性,以铁岗水库为例根据水库实际情况,进行汛期分期,从更有利的发挥水库防洪作用、尽可能利用洪水资源的角度出发,保证水库安全方面考虑设计汛限水位分期控制方案,并进行洪水调度,确定分期汛限水位。In order to excavate the reservoir's storage capacity ,to explore the possibility of improving the flood control level ,this paper takes the Tiegang Reservoir as an example .It divides flood seasons according to the actual situation of the reservoir ,and designs the staging control proposal of flood control level .To play the role of reservoir flood control more advantageous ,we should use flood resources as much as possible ,ensure the safety of the reservoir ,and determine the flood level by flood regulation .

关 键 词:汛限水位 分期控制 洪水调度 

分 类 号:TV697.11[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象