检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《吉林水利》2014年第12期28-30,44,共4页Jilin Water Resources
摘 要:针对西藏旁多水利枢纽工程在设计、运行过程中存在的施工空间有限、冲刷严重、右岸山体防护困难等问题,通过1:60比尺的模型试验,提出了扭曲扩散挑流消能工设计方案。试验成果表明,该方案成功解决了下游消能困难、回流淘刷山体严重等问题,能够满足工程的实际需要。对于同类型工程的消能防冲设计有一定的借鉴意义。For the existing issues during design and operation of Pangduo water conservancy project in Tibet,such as running space limited,severe erosion,the right bank of the mountain protection problems etc.,by 1:60scale model tests,the distorted energy dissipator design was proposed.Test results show that the scheme successfully resolved the downstream energy dissipation difficulties,reflux scouring brush mountain serious problems to meet the actual needs of the project.It provides the references for the same type of project energy dissipation design.
分 类 号:TV135.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.175.71