检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《西北水电》2014年第6期74-77,共4页Northwest Hydropower
摘 要:李家河供水工程为长距离有压重力输水管道工程。为减小管末端静水压力及水锤压力,将管道分成2段,在每段末端设矩形调节池,调节池兼消力池。对矩形长调节池的消能做了水力学模型试验,以观察流态,实测最大流速及真空度、检验效能效果,最后提出调节池的尺寸等方案,并对矩形长调节池与圆形池比较,其结果可供同类工程参考。The Lijiahe water supply project features the long pressure water transmission pipeline by gravity.To minimize the static pres-sure and water hammer pressure at the pipeline end, the pipeline is divided into two sections.One rectangular regulation tank is provided at the end of each section.This regulation tank is also the stilling basin.The energy dissipation of the long rectangular regulation tank is tested through the hydraulic model to observe the flow regime, measure the maximum flow velocity and vacuity, and verify the energy dis-sipation effect.Finally, the size of the regulation tank is proposed as well as the rectangular and the round regulation tanks are compared. The results provide reference to the other similar projects.
分 类 号:TV131.6[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36