检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁大桥局集团股份有限公司,湖北武汉430050
出 处:《铁道建筑》2014年第12期13-17,共5页Railway Engineering
摘 要:将军渡黄河特大桥是我国第一座按30 t轴重设计、施工的重载铁路桥梁,其主桥为钢桁梁,堤内引桥为现浇箱梁结构。本文结合桥址处水文地质情况、现场施工条件选择主桥与引桥的施工方案,并阐述了施工质量控制要点,为后续同类型重载铁路桥梁施工积累了经验。The Jiangjundu Yellow River super-long bridge,designed and built for the first time based on 30 t axle load,is applied to the heavy haul railway in China. The main bridge is a steel truss while the approach bridges use box girders cast in place. T he construction scheme was determined according to the hydrogeological condition at the bridge location and on-site construction condition. T he key to construction controlling was demonstrated, accumulating experience for the future similar bridges on the heavy haul railway.
分 类 号:U445[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222