检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈龙[1]
机构地区:[1]广西电力工业勘察设计研究院,广西南宁530023
出 处:《广西水利水电》2014年第6期21-27,共7页Guangxi Water Resources & Hydropower Engineering
摘 要:红水河桥巩水电站船闸设计水头为24.6 m,属高水头船闸,船闸输水廊道工作阀门采用平板门,突破了平面阀门在船闸的应用范围。重点介绍了桥巩船闸的主要技术特征、船闸建筑物总体布置、输水系统等方面的设计,并对船闸输水系统的主要技术特点进行了概括和总结,为高水头船闸的设计提供参考。With a design head of 24.6m,the shiplock of Qiaogong Hydropower Project on Hongshui River is a high water-head lock. The service valve of water transmissiom gallery is designed as flat gate which is not within the ap-plicable range of plane valve for ship lock. An introduction was made on the major technical characteristics of Qiaogong shiplock,the general layout of lock structures,design of water transmission system etc.,based on which the author summarized the technical features of lock water transmission system,aiming to provide reference for de-sign of high water-head ship lock.
关 键 词:高水头单级船闸 总体布置 输水系统 阀门段廊道体型 设计
分 类 号:U641.2[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.202.111