机构地区:[1]河北钢铁集团矿业有限公司,河北唐山063000
出 处:《建井技术》2014年第5期19-22,共4页Mine Construction Technology
摘 要:大贾庄铁矿3号副井-450m水平巷道掘进至距井筒100m左右时,放炮后,发生了较大突水事故,突水量210m3/h左右。在30min内,巷道全部被水淹没,水深平均200mm。根据具体情况,借鉴隧道工程建设经验,决定采用止浆墙注浆法治理突水。方案实施后,取得了成功,并收到了良好的效果。When a-450m level roadway heading had a distance of about 100m to No.3 Mine Auxiliary Shaft of Dajiazhuang Iron Mine,a large water inrush accident was occurred after a blasting conducted and the water inrush quantity was about 210m3 /h.Within 30 minutes,the mine roadway was fully flooded and a water depth was 200mm in average. According to the certain condition and with the con struction experiences of other tunneling projects,a grouting method with a grouting cushion was deter mined and applied to the water inrush control. After the plan was conducted,a successful water control was obtained and an excellent effect was obtained.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13