检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆交通大学河海学院,重庆400074 [2]重庆市合川航道管理段,重庆401520
出 处:《重庆交通大学学报(自然科学版)》2014年第6期89-92,共4页Journal of Chongqing Jiaotong University(Natural Science)
摘 要:通过长江德感坝采沙概化模型试验,模拟了各流量级的冲刷过程,分析了采沙对德感坝河段的影响。结果表明:山区河流采沙引起的河床、河势、航槽通航能力变化影响较小,采沙坑也很难引起溯源冲刷,对涉河工程影响甚微,该处适合设立采沙点进行采沙作业;但采沙坑回填量远小于其开采量,应科学规划开采量及开采方式,引导河势向有利于稳定的方向发展。Through the generalized model experiment of sand-gravel extraction of Degan dam in the Yangtze river,the erosion process of each level of flow was simulated,and the influence of sand mining on Degan dam river was also analyzed. The test results indicate that the navigation ability variation of the river bed,the regime and the channel caused by mining in the mountainous river is lesser,and the sand mining pit is also difficult to cause the traceability of the scour. The river course engineering is of almost no effect,so it is suitable for the establishment of sand mining point to extract sand. But the mining pit backfill quantity is far less than its yield,so the mining amount and mode should be scientifically planned,which will guide the regime to develop in the stable direction.
分 类 号:U617[交通运输工程—船舶及航道工程] TV74[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15