检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江西省电力科学研究院,江西南昌330096 [2]华润电力控股有限公司华南分公司,广东广州510000
出 处:《锅炉制造》2015年第1期1-4,共4页Boiler Manufacturing
摘 要:本文通过试验研究,分析了660MW超超临界机组锅炉在运行过程中出现受热面管壁超温的原因,并总结了经济可行的优化策略。根据该策略进行调整优化后,可使锅炉在主再热汽温升至额定参数时,受热面管壁温度仍然低于超温报警值较多,彻底解决了受热面管壁超温的难题。该炉型是同样技术百万机组的缩小版,因此本文研究成果对同炉型的660MW和1000MW机组的锅炉运行具有很强的指导意义。Through experiments, this paper analysis the cause of the 660MW ultra supercritical boil- er heating surface tube' s overheating while operating, and summarizes feasible and economical strategies. According to the strategies, heating surface tube wall temperature is lower than the temperature alarm value when the boiler' s temperature in the main and reheat steam rise to the rated parameters, which completely solves the problem of heating surface tube wall temperature. The furnace is a smaller version of the same technology million units, so this paper has a strong guiding significance to the boiler of 660MW and 1000MW units.
分 类 号:TK227[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.72