90t/h干熄焦发电机组推力瓦温过高故障处理  

Fault Handling for Thrust Tile Overheating of 90 t/h Dry Quenching Generator

在线阅读下载全文

作  者:林峰[1] 陈显华[1] 凌宇[1] 

机构地区:[1]新余钢铁集团有限公司,江西新余338001

出  处:《江西冶金》2014年第6期37-39,共3页Jiangxi Metallurgy

摘  要:新钢第一动力厂90 t/h干熄焦发电机组自安装投入运行以来,由于机组带一半负荷时汽轮机推力瓦的温度就会超过报警值,使机组一直都不能在正常负荷下运行。针对这一问题,通过分析找出了故障原因,并采取了熔孔补焊,车削铜堵头,将瓦块与推力盘互研刮直至瓦块工作面接触点在65%以上的措施,现已使该机组可以满负荷运行。Since 90 t/h dry quenching generator commissioning in No. 1 Power Plant in Xinyu Steel, it always cant run in the normal load due to the thrust tile temperature of the steam turbine exceed alarm value when it is half loaded. In order to solve this problem, the failure reason is found out through analysis. And taking the measures of melt hole repair welding, turning copper plug and scraping the trust tile and disc, the work surface contact point reach more than 65%. The generator can run with full load at present.

关 键 词:干熄焦余热发电 汽轮机组 推力瓦 研点 

分 类 号:TK268.1[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象