机构地区:[1]东北林业大学工程咨询设计研究院,黑龙江哈尔滨150040 [2]北京江川河路桥技术服务有限公司,北京100000 [3]北京交通大学土木建筑工程学院,北京100044
出 处:《公路工程》2014年第6期25-28,55,共5页Highway Engineering
基 金:中央高校基本科研业务费专项资金项目(2013YJS067)
摘 要:通过对某高速公路超浅埋大跨度连拱隧道下穿既有国道的施工方法比选分析,利用大型有限元软件进行施工数值模拟,分析认为,采用大管棚超前支护、中导洞-双侧导洞法配合地层注浆加固的施工方法可以满足沉降要求,且保证了既有国道车流不中断,施工过程中拱部衬砌封闭成环时间是控制地表沉降的关键,本工程的成功实施为类似隧道施工提供了经验借鉴。In this paper, construction methods of the great shallow-buried and large span arched tunnel across existing national road in expressway have been compared and analyzed. And finite element software has been used to simulate the construction process. The analysis shows adopting the large shed- pipe advance support method and middle pilot-twin-side heading method combined with strata grouting reinforcement method can meet settlement requirements. And these methods can also ensure that the existing national highway traffic is not interrupted. In the process of construction, the time when the arch lining closed is the key to control the surface settlement. The successful implementation of this project is to provide a similar tunnel experience for others.
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222