政府投资项目代建制的激励约束机制及风险管理探析  

The Incentive and Constraint Mechanism and Risk Management of Agent Construction System of Government Investment Project

在线阅读下载全文

作  者:李幽铮[1] 

机构地区:[1]金陵科技学院建筑工程学院,江苏南京211169

出  处:《现代工业经济和信息化》2014年第21期15-17,共3页Modern Industrial Economy and Informationization

基  金:江苏省教育厅科研资助项目(08sjd6300071);课题名称:政府投资项目代建制的研究

摘  要:作为顺应时代出现的新事物,政府投资项目代建制也是今后投资工作必定会面临的发展趋势,也是发达国家最常用的措施之一。作为一种管理制度的创新,代建制在国内得到广泛应用。作为一种探索性的工作,其基本思路是正确的,但是在具体操作上却会面临诸多问题,因此文章通过政府投资项目代建制的激励约束机制及风险管理的分析,希望能够将问题解决,帮助其顺利地发展。As to adapt to new things emerging era, the trend of development of agent construction system of government investment project is also the future investment work will face, but also one of the most commonly used measures in developed countries. Innovation is a kind of management system, construction agent system is widely used in domestic. As a kind of exploration work, the basic idea is correct, but in the specific operation will face many problems, so the incentive and constraint mechanism and risk management through the agent construction system of government investment project analysis, hope to be able to solve the problem, to help the smooth development of.

关 键 词:政府投资项目代建制 激励 约束 风险 

分 类 号:F283[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象