检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交四航工程研究院有限公司,广东广州510230 [2]中交四航第二工程有限公司,广东广州510300
出 处:《混凝土》2014年第12期139-141,共3页Concrete
摘 要:对中东地区高温干燥环境下大体积混凝土方块预制中的养护方法进行优化研究。分别采用养护液和水两种养护方法,与薄膜、麻袋、土工布、泡沫板等几种保温保湿材料组合,对混凝土方块进行为期7 d的养护观测。以混凝土方块温度、温差和养护前后裂缝出现情况为标准评价养护效果,得出:滚涂养护液养护包裹泡沫板、土工布等保温材料的方法最有利于控制温差;水养护不利于控制温差,但在控制干燥收缩裂缝上面效果更好。The optimization of mass pre-cast concrete block curing methods in middle east’s high temperature and dry circumstance was studied.There are two curing method that curing compound and water,which combining several heat and moisture insulation material film,sacks,geotextile fabric,foam board,and observe the curing process in 7 d.Take the concrete temperature,temperature difference and cracks appeared before and after curing process as standard in the evaluation of curing effect.Combined the heat insulation material foam board,geotextile fabric and so on.Curing compound method is best in temperature difference controlling.Water curing method is not good at temperature difference controlling,but is better at dry shrinkage cracks controlling.
分 类 号:TU528.064[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.41