检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南地方煤炭集团有限公司,河南郑州450000
出 处:《中州煤炭》2014年第12期5-6,10,共3页Zhongzhou Coal
基 金:煤炭资源与安全开采国家重点实验室自主研究课题(SKLCRSM09X02)
摘 要:以河南省洛阳叁伟煤业有限公司二1煤层特大断面支架换装硐室为工程背景,针对特大断面换装硐室的围岩控制难题,提出了采用高性能、高预紧力锚杆提高内承载圈强度,再辅以高强锚索在围岩中形成外承载圈,以内、外承载圈相互作用提高围岩自稳性,进而通过喷浆防止围岩风化和支护结构锈蚀的特大断面换装硐室围岩控制技术,实现了有效控制顶板破碎垮落和围岩剧烈变形。工程实践验证了该支护指导思想和技术的科学性。Taking transshipping chamber with super-large section of Luoyang Sanwei Coal Industry Company in II1 coal seam as engineering background, aiming at the problems of transshipping chamber with super-large section, surrounding rock control technology for transshipping chamber with super-large section was proposed, that was:bolts with high performance and high strength should be adopted to improve the strength of the internal bearing ring, coupled with high strength anchor cable, the outer bearing ring was formed in the sur- rounding rock. With the interaction of internal and outer bearing tings ,the stability of surrounding rock was improved. The method of guniting was used to prevent surrounding rock weathering and supporting structure rusting. Caving of roof and severe deformation of surrounding rock were controlled effectively. Engineering practice has confirmed the scientificity of guiding ideology and technology of supporting.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166