三峡工程蓄水后荆江河段设计水位的计算与确定  被引量:4

Calculation and determination of designed water stage at Jingjiang reach of the Yangtze River after impoundment of Three Gorges project

在线阅读下载全文

作  者:雷国平 尹书冉 黄召彪 

机构地区:[1]长江航道规划设计研究院,湖北武汉430011

出  处:《水运工程》2014年第12期125-129,共5页Port & Waterway Engineering

摘  要:分析了三峡工程蓄水后影响枯水位变化的主要因素,采用1982—2002年水文资料对荆江河段设计水位进行计算,参照水沙数学模型所得预测值,并利用蓄水以来的荆江河段枯水位对其进行复核,得到的设计水位偏于安全,既体现了蓄水后的影响,又反映了设计水位的变化趋势。This paper analyzes main factors influencing the low water level after the impoundment of the Three Gorges project, calculates the designed stage of Jingjiang reach according to the hydrological data during year 1982 and 2002, and checks the stage referencing the predicted value obtained from the water-sand mathematical model and according to the low stage of Jingjiang reach after the impoundment, we get the designed stage which is relatively safe and which reflects not only the impact of the impoundment , but also the variation trend of the designed stage.

关 键 词:三峡工程 荆江河段 通航设计水位 

分 类 号:U612.3[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象