特高压直流输电工程系统调试的安全技术措施研究  被引量:4

Study on the Technical Safety Measures for UHV DC Transmission Project Commissioning

在线阅读下载全文

作  者:童凯[1] 陆承宇[1] 蔡耀红[1] 阮黎翔[1] 宣佳卓 

机构地区:[1]国网浙江省电力公司电力科学研究院,杭州310014

出  处:《浙江电力》2014年第12期1-3,共3页Zhejiang Electric Power

摘  要:溪洛渡—金华±800 k V特高压直流输电工程交流系统和直流系统分阶段投运,为保证直流系统调试期间交流场能够安全稳定运行,必须进行安全隔离。对交流系统与直流系统的相互影响因素进行了详细分析,并归纳总结,提出了相应的软/硬件安全隔离技术措施,可供后续有关直流工程参考。AC system and DC system in into operation in different stages. During ±800 kV Xiluodu-Jinhua UHV DC transmission project will be put the commissioning of DC system, the safe and stable operation of AC system is guaranteed by the isolation between two systems. In this paper, the interaction between two systems is analyzed and summarized. The technical isolation measures for software and hardware are proposed, which can be further referenced by similar DC projects in future

关 键 词:宾金直流 系统调试 隔离措施 

分 类 号:TM721.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象