检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:米宏广[1]
出 处:《港工技术》2014年第6期35-38,共4页Port Engineering Technology
摘 要:本文以深圳地铁1号线续建工程前海车辆段工程为例,对车辆段上部盖有物业开发房屋的车辆段如何合理确定结构方案,避免结构体系成为严重不规则结构,提高其抗震性能等需考虑的问题及采取的对策进行了详细论述,并据此确定了车辆段的合理结构方案。并对如何采用结构构件自身防火并使其达到4 h的耐火极限提出了解决办法。并据此完成车辆段的设计,为以后类似工程的设计提供借鉴。Based on the construction of Qianhai metro depot of Shenzhen Metro Line 1 continued project, relevant problems and countermeasures were discussed in detail in order to determine reasonable structure of the metro depots under the property developed buildings,avoid serious irregular structure and improve structural strength under shock. And the solution was proposed for the structural members reaching 4.0 h fireproofing high-point. Accordingly the metro depot was successfully designed,which may provide references for similar projects.
分 类 号:U231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229