董箐水电站工程溢洪道宽大泄槽掺气设施设计  被引量:2

Design of Large Chute Aerator Facility in Dongqing Hydropower Station Project Spillway

在线阅读下载全文

作  者:李水生[1] 李晓彬[1] 申显柱 

机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵阳550081

出  处:《中国水能及电气化》2014年第12期52-54,共3页China Water Power & Electrification

摘  要:董箐水电站工程溢洪道泄槽宽度达50m,根据掺气减蚀原理,设计出了一种适应宽大泄槽的新型掺气坎体型。经数值计算分析,新型掺气坎掺气效果更明显、均匀,解决了宽大泄槽中部掺气的技术难题。该新型掺气坎结构简单、易于施工、效果明显,具有良好的推广应用价值。Dongqing Hydropower Station Project spillway chute width is up to 50m. A novel aerator shape suitable for large chute is designed according to aeration cavitations reducing principle. Novel aerator has more prominent and evener aeration effect according to numerical calculation analysis. Technical difficulty in aeration in large chute is solved. The novel aerator has advantages of simple structure,easy construction and prominent effect with excellent promotion application value.

关 键 词:董箐水电站 溢洪道 宽大泄槽 掺气坎 设计 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象