基于DELMIA的虚拟维修过程建模及应用  被引量:5

Virtual Maintenance Process Modeling and Application Based on DELMIA

在线阅读下载全文

作  者:王小强[1] 王金利[1] 冯恒[1] 

机构地区:[1]中航工业第一飞机设计研究院,陕西西安710089

出  处:《航空科学技术》2014年第12期73-76,共4页Aeronautical Science & Technology

摘  要:为了实现基于DELMIA的虚拟维修过程建模,通过在传统的维修过程分解体系中加入维修动作层,构建了包含四个层次的维修过程分解体系,利用PERT图实现了虚拟维修过程建模,给出了作业时间的预计方法,并以某型飞机发动机拆卸过程为例,验证了方法的可行性。For achieving virtual maintenance process modeling based on DELMIA, a new decomposition system consisting of four levels for maintenance process was constructed through adding maintenance activity level. Then a modeling method of virtual maintenance process was achieved using PERT chart in DLEMIA. Based on this process model, a method of predicting maintenance time was set up. Finally, took the engine disassembling process of a aircraft as an example, the feasibility of this method was validated.

关 键 词:虚拟维修 过程建模 PERT图 预计模型 

分 类 号:V241.07[航空宇航科学与技术—飞行器设计]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象