高外江水位下合流制截流管网建设和运行问题探析  被引量:3

Analysis on Construction and Operation of Combined Interceptor Sewers in Karst Topography Regions with High External River Levels

在线阅读下载全文

作  者:彭艺艺[1,2] 左剑恶[1] 干里里[1] 刘广钊 孟宪翚 陈柳旋 

机构地区:[1]清华大学环境学院环境模拟与污染控制国家重点联合实验室,北京100084 [2]柳州市污水治理有限责任公司,广西柳州545001

出  处:《中国给水排水》2015年第2期11-13,共3页China Water & Wastewater

摘  要:对喀斯特地貌地区高外江水位下的城市截流式合流制管网,在建设和运行中存在的雨水溢流污染、管道渗漏污染和管道淤积等问题进行了系统分析和讨论,有针对性地提出了源头控制减少溢流雨水污染、优化截流收集污染雨水、调蓄处理污染雨水、提高维修水平减少管道渗漏、加强维护管理减少管道淤积等措施,并对我国合流制截流管网建设和运行的发展前景进行了展望。The problems such as rainwater overflow, sewer leakage and siltation in the intercepting well and sewer, which often occur during construction and operation of combined interceptor sewers in karst topography regions with high external river levels, were systematically discussed and analyzed. Some specific solutions such as controlling the pollution at source to minimize the CSO pollutants, optimizing the interception ratio to collect polluted rainwater, building detention tanks to collect and store the polluted rainwater, improving the pipe maintenance standard to reduce sewer leakage pollution and strengthening the operation management of the sewer system to reduce siltation in sewers were proposed. The prospects on construction and operation of combined interceptor sewers were described.

关 键 词:合流制截流管网 雨水溢流 管网渗漏 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象