检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京工业职业技术学院建筑工程系,北京100042 [2]中国矿业大学(北京)煤炭资源与安全开采国家重点实验室,北京100083
出 处:《煤炭工程》2015年第1期53-56,共4页Coal Engineering
基 金:北京市教育委员会科技计划面上项目(PXM2010 014225 097947)
摘 要:矿井2052工作面靠近五煤风氧化带,巷道掘进过程中出现不同程度的煤层冲刷变薄甚至消失,为了解工程地质情况,在胶带巷掘进迎头和侧帮采用井下三分量多测线联合观测,将现场采集的数据处理后,绘制出相应的地震剖面和三维数据体视图,据此推算出迎头前方约90-120m存在异常反射带,侧帮异常界面深度介于24-36m之间。经现场钻探验证分析,风氧化带边界位于胶带巷靠工作面一侧30m范围内,而迎头未能探测到煤层,建议在原探点掘进约50m后再进行探测。As the working face was closed to oxidation zone of No.5 coal seam,during the roadway excavation,condition of coal seam wash out appeared,the coal seam became thinner or even completely washed out,to understand the engineering geology condition,three- components and multiple survey lines observation system was applied,with parallel survey lines arranged on heading face and rib.After datum processing,the corresponding seismic sections and 3D datum views were drew,according to which conclusions were calculated that,the abnormal reflection bands locate at the 90 -120m ahead of the heading face,and at 24 - 36 m deep within the rib.According to field measurement,the oxidation zone boundary located within 30 m of working face at conveyor lane side,as coal seam was not detected right ahead the heading face,detect at another 50 m heading forward was suggested.
分 类 号:P631.4[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28