呼和乌素煤矿特大突水事故应急处理及后续治理方案  被引量:3

Emergency and Subsequent Treatment of Ultra- large Water Inrush Accident in Hoh Us Coal Mine

在线阅读下载全文

作  者:迟国铭 张立辉[1] 

机构地区:[1]神华神东煤炭集团补连塔煤矿,内蒙古鄂尔多斯017209

出  处:《煤炭工程》2015年第1期71-73,共3页Coal Engineering

摘  要:呼和乌素煤矿露天采坑因与小煤窑采空区贯通导致突水被淹,进而波及呼和乌素井工矿和临近补连塔煤矿采空区,基于此,研究采取了封堵突水点、注浆封堵突水巷道、积极排水、可控疏水降压等措施,并提出了永久解决乌兰木伦河对相关矿井影响的应对方案,保证了矿井的安全。As Hoh Us open pit coal mine cut- through the goaf of a small mine,water inrush accident happened,and spread to Hoh Us underground mine and the adjacent goaf of Bulianta coal mine.Based on this condition,water inrush point was blocked,water inrush roadway was sealed with grouting,water drainage and controllable water pumping and pressure releasing were conducted,ensuring the coal mine safety.And the permanent solution for coal mine water problems caused by Ulan Moron River.

关 键 词:特大突水事故 老空水害 小煤窑 注浆封堵 排水 可控疏水降压 

分 类 号:TD745.3[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象