大面积高填方工程地下水后评价探讨  被引量:6

Discussion on Post Evaluation of Groundwater in Large Area High-fill Project

在线阅读下载全文

作  者:谢春庆[1] 钱锐[2] 

机构地区:[1]成都军区空军勘察设计院,成都市610041 [2]成都理工大学,成都市610059

出  处:《勘察科学技术》2014年第6期1-4,64,共5页Site Investigation Science and Technology

摘  要:该文结合机场等高填方工程的实践,探讨了大面积高填方工程进行后评价的意义以及填方工程中与地下水有关的不良地质现象的形成原因,提出了大面积高填方工程地下水后评价概念、填方工程中地下水监测内容和方法、原地面地基和填筑体中由于地下水所引起的常见不良作用的评价内容和方法。Combined with the practice of high-fill engineering in the airport, this paper discussed the significance of post evaluation on the large area high-fill engineering and the cause of the adverse geological phenomenon related to the groundwater, proposed the concept of post evaluation of groundwater on the large area high-fill engineering, the content and method about groundwater monitoring in filling project, the detail and mesuares of evaluation about the common adverse effects caused by groundwater in original ground foundation and the filling body.

关 键 词:高填方 地下水 监测 不良作用 后评价 

分 类 号:TU751.4[建筑科学—建筑技术科学] P641[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象