检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北钢铁集团矿山设计有限公司
出 处:《黄金》2015年第1期40-42,共3页Gold
基 金:"十二五"国家科技支撑计划项目(2013BAB02B08)
摘 要:针对田兴铁矿1#主井井壁突水情况及井壁裂隙破碎带的结构特点,介绍了在出水点埋设3根导水管将井壁涌水引入工作面水窝,再浇筑混凝土井壁形成支撑结构防止围岩失稳、裂隙扩展,最后待浇筑混凝土养护后对其壁后注浆封水的突水治理方案。其中,壁后注浆采用上行式注浆,由下而上逐步推进注浆封水,注浆孔分3层上下菱形交错布置。经过井壁突水综合治理方案的实施,田兴铁矿1#主井井壁裂隙破碎带涌水从最初的64 m3/h降到近20 m3/h,对井壁涌水起到了封堵作用,有效保障了后续井筒下掘施工的安全。According to the situation of 1# main shaft water inrush and the characteristic of wall cracks,three aqueducts buried at the water point were used to put water into nest,then concrete wall was formed to prevent instability of surrounding rock and crack propagation,and finally back grouting where grouting hole was divided into three layers on the diamond staggered arrangement and the upward grouting was used for water shutoff was adopted when wall maintenance has reached the standard. Through effective execution of comprehensive control technology,the shaft water has been reduced from 64 cubic meters per hour to as low as 20 cubic meters per hour,effectively shutting off water inrush and guaranteeing the safety operation of following excavation construction.
分 类 号:TD743[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69