检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,陕西西安710065
出 处:《水力发电》2015年第2期86-89,97,共5页Water Power
摘 要:基于CATIA三维平台的水电工程平面监测网的设计与优化,利用相关上游专业建立的包含开挖线、枢纽建筑物、覆盖层、松动体等影响平面监测网设计相关要素的三维模型,在三维地表上布点建网,既能紧密结合工程实际,又能快速优化调整网形,为平面监测网设计提供了一种新的方法。通过三维平台检查、调整、优化平面监测网的布置,提高了工作效率,同时,也将平面监测网设计统一到CATIA三维平台上。Based on CATIA 3D platform, the design and optimization of horizontal control network in hydropower projects are conducted, in which, a 3D terrain model is established and then the horizontal control network is completed on this model. Some important information which will influence the design of horizontal control network is included in the model, such as excavation lines, hydraulic structures, overburdens and loose bodies. This model can not only closely reflect actual engineering practice, but also quickly optimize horizontal control network. The design efficiency of horizontal control network can be improved through the inspection, adjustment and optimization of 3D platform, and at the same time, the design of horizontal control network will be integrated to CATIA 3D platform.
分 类 号:TV221.1[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.232.226