GPU并行加速的多步逆时偏移在东濮前梨园地区的应用  被引量:2

The application of GPU accelerated multi-step reverse time migration to the Dongpu oilfield

在线阅读下载全文

作  者:张慧[1] 蔡其新[1] 秦广胜[1] 高爱荣[1] 林玉英[1] 

机构地区:[1]中国石化中原油田分公司物探研究院,河南郑州450000

出  处:《物探与化探》2015年第1期161-165,共5页Geophysical and Geochemical Exploration

基  金:国家油气重大专项(2011ZX05006-004)

摘  要:为了解决东濮油田复杂断块成像难题,笔者采用了多步逆时偏移成像方法,并使用了GPU进行并行加速。经过GPU并行加速的多步逆时偏移成像方法解决了RTM计算效率低的应用限制问题,并成功应用于复杂断层成像处理中。通过对前梨园三维地震资料的偏移成像处理,验证了逆时偏移成像技术在处理东濮地下复杂小断块和兰聊大断层上具有成像优越性;偏移效率分析试验证明了基于GPU并行加速的逆时偏移成像方法,能有效地提高计算效率75倍。In order to solve complicated faults imaging problem of the Dongpu oilfield,the authors utilized multi-step reverse time mi-gration method and realized GPU accelerate parallel algorithm for overcoming the low compute efficiency disadvantage of RTM.The GPU accelerated multi-step reverse time migration method was successfully applied to complicated faults imaging processing. The RTM ima-ging result of Qianliyuan 3D data proved the technological advantage of RTM for complicated small faults imaging and Lanliao dip-angle faults imaging.Migration efficiency analyses demonstrate that RTM based on GPU accelerate algorithm can effectively improve the com-putational efficiency by 75 times.

关 键 词:东濮油田 逆时偏移 GPU 多步法 偏移成像 

分 类 号:P631.4[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象